MC Squared provided Quality Control (QC) services for concrete testing as part of the St. Petersburg Northwest Water Reclamation Facility (WRF) Improvements project. Our team conducted field and laboratory testing to assess concrete strength, composition, and durability, ensuring compliance with project specifications. By delivering accurate and timely test reports, we supported construction progress and upheld the integrity of critical infrastructure.
Continue readingCaloosahatchee River West Basin Storage Reservoir (C-43 WBSR)
Developed by C-43 Water Management Builders for the South Florida Water Management District (SFWMD) and U.S. Army Corps of Engineers (USACE), the C-43 West Basin Storage Reservoir is a 170,000-acre-foot infrastructure project designed to store excess freshwater from the Caloosahatchee River, stabilize salinity levels, and prevent algal blooms. MC Squared provided critical laboratory management, construction materials testing, and quality control, ensuring compliance with USACE standards. Our contributions—including testing 22 million cubic yards of embankment, 110,000 tons of soil-cement armoring, and 19 miles of soil-bentonite cutoff wall—have helped ensure the reservoir’s durability, reliability, and long-term impact on Florida’s water resources and communities.
Continue readingCity of Tampa UCAP Pipelines, City of Tampa, Florida
Provided subsurface investigations and associated recommendations for a proposed 48-inch waterline from the David L. Tippin Treatment Plant to South Tampa, a distance of approximately 65,000 LF. The project included horizontal directional drilling and tunneling under the Hillsborough River as well as numerous deep tunnel crossings under major roadways along the project alignment.
Dale Mabry Stormwater Tunnel, City of Tampa, Florida
Performed a limited Phase I along the project corridor to evaluate potential contamination that could affect the development of the project which included 7000 LF of stormwater tunnel thru a residential neighborhood. Also provided a baseline geotechnical report and laboratory testing to support the future design. The project was intended to alleviate flooding in the South Tampa area of Hillsborough County.
Continue readingGary Adult High School and Adult Education District Offices, Hillsborough County, Florida
Provided geotechnical investigations and foundation recommendations for this new facility in East Tampa. The improvements include a new 40,000 SF two level facility with associated interior parking, roadways and retention areas.
Continue readingAcademy of the Lakes, Pasco County, Florida
Provided geotechnical investigations and foundation recommendations for a gymnasium at the existing school site in Pasco County, Florida. The improvements also include a new stormwater retention area.
Continue readingChrist the King Church and School Additions, Tampa, Florida
Provided geotechnical investigations and recommendations for this new 3 story Parrish Community Center, a new 2 story administration building and a new 2 story school building for a total of 38,000 SF.
Continue readingMcLane Middle School, Hillsborough County, Florida
Provided materials testing (soils and concrete) during construction for this addition to McLane Middle School in Hillsborough County. Improvements include a new gymnasium and media center building.
Continue readingKenley Elementary School, Hillsborough County, Florida
Provided construction materials testing (soils and concrete) on this renovation project. The school is located in Hillsborough County, Florida.
Continue readingCypress Elementary, Pasco County, Florida
Provided geotechnical investigations and foundation recommendations for a new modular building at the existing school site in Pasco County, Florida. The improvements also include a new stormwater retention area.