Provided subsurface investigations, testing and foundation recommendations and associated reports for the modification of two interchanges (I-75 and Fruitville RD and I-75 and University Parkway). The project included ramp modifications, drainage, overhead lighting and signalization. The work was performed for FDOT District 1.
Continue readingHillsborough Transit Authority (HART) and Bus Rapid Transit (BRT) Consultant Services, Hillsborough County, Florida
Provided Geotechnical Engineering Recommendations Consisted of asphalt and concrete pavement cores and soils borings for roadway improvements, including retaining walls and adding totem poles and shelter structures at for several bus stops along Fletcher and Nebraska Avenues in Tampa, Florida.
Continue readingSR 20 Widening and Improvements Cherokee and Forsyth Counties, Georgia
Provided Geotechnical Engineering Recommendations for the widening/reconstructing SR 20 from an existing two lane rural highway to a divided four-lane rural highway along SR 20 from SR 369 in Cherokee County to SR 371 in Forsyth County. The total length of the road is about 6.5 miles. Provided, Inc. performed pavement study and soil survey.
Continue readingSR 105 at US 44, Habersham County, Georgia
Provided Geotechnical Engineering Recommendations for the Widening of SR105 from the intersection of Cannon Bridge Rd, west of SR 365 to Walnut Street in Cornelia for a total of 2.74 miles. In the project is the reconstruction of the interchange at US441/SR 105 and SR 365 as a diamond interchange. The construction widens US441/ SR 105 to a six- lane divided roadway with a 20′ raised median from Cannon Bridge road to SR 365.
Continue readingSR 155 Candler Rd, DeKalb County, Georgia
Provided Geotechnical Engineering Recommendations and pavement evaluations services on SR 155 Candler Road in DeKalb County. The total length of the project is 3.6 miles.
Continue readingSardis Rd Connector, Gainesville, Georgia
Provided geotechnical engineering services for the Sardis Rd Connector project in Gainesville GA. The project consisted of both a GDOT Soil Survey, and a Level II contamination screening at selected sites throughout the future roadway corridor. Our scope of services including soil survey and Level II Environmental Contamination Screening.
Continue readingCOA SAG II Phase I Permeable Pavers City of Atlanta, Fulton County, Georgia
Provided geotechnical engineering services for the installation of permeable interlocking concrete pavers (PICP) on top of open graded aggregate. The objective of this study is to provide the information for the design of green infrastructure stormwater improvement solution to mitigate local flooding.
Continue readingI-85, SR 53 US 129/SR 11, Jackson County, Georgia
Provided pavement evaluations and recommendation services on Interstate I-85, SR 53 & US 129/SR 11 in Jackson County, Georgia. The total length of the study is Eight (8) miles in each direction. The scope of services included providing pavement condition surveys and pavement design evaluations along with Geotechnical Engineering Recommendations along I-85 main line north and south bounds and for the ramps at the interchange of SR 53 and interchange at SR 11.
Continue readingSR 101 for Various Project Segments, Floyd County, Georgia
Provided evaluation of the existing pavement conditions to support the Concept Development/Validation of various roadway projects along SR 101, to evaluate the need for overlay, full depth or reconstruction.
Continue readingSR 40 Connector 821, Charlton, Georgia
Provided Geotechnical Engineering Services for the roadway consisting of Pavement Evaluation, Soil Survey and Wall Foundation Recommendation along SR 40 from Conn/Folkston to MP 2.75/E of CR 82, Charlton Counties, GA. The total length of the roadway is approximately 1.9 miles. The project consists of approximately 1.9 miles of pavement overlay, about 1.75 miles of new pavement ranging from 2 to 3 lanes, and one (1) bridge culvert with retaining walls.
Continue reading