MC Squared provided Quality Control (QC) services for concrete testing as part of the St. Petersburg Northwest Water Reclamation Facility (WRF) Improvements project. Our team conducted field and laboratory testing to assess concrete strength, composition, and durability, ensuring compliance with project specifications. By delivering accurate and timely test reports, we supported construction progress and upheld the integrity of critical infrastructure.
Continue readingCaloosahatchee River West Basin Storage Reservoir (C-43 WBSR)
Developed by C-43 Water Management Builders for the South Florida Water Management District (SFWMD) and U.S. Army Corps of Engineers (USACE), the C-43 West Basin Storage Reservoir is a 170,000-acre-foot infrastructure project designed to store excess freshwater from the Caloosahatchee River, stabilize salinity levels, and prevent algal blooms. MC Squared provided critical laboratory management, construction materials testing, and quality control, ensuring compliance with USACE standards. Our contributions—including testing 22 million cubic yards of embankment, 110,000 tons of soil-cement armoring, and 19 miles of soil-bentonite cutoff wall—have helped ensure the reservoir’s durability, reliability, and long-term impact on Florida’s water resources and communities.
Continue readingCity of Augusta J.B. Messerly Water Pollution Control Plant (WPCP), Augusta, Georgia
Provided engineering recommendations and construction oversight, management & inspection and construction materials testing of soils, concrete and asphalt for the JB Messerly WTP. Construction costs $80 million.
Continue readingE.L. Huie Jr. Constructed Wetlands Phases 1-4, Clayton County, Georgia
Provided Geotechnical Engineering Recommendations and construction materials testing and inspection for the 100 acres natural effluent treatment facility. The project consists of building an impoundment (earthen dam) to treat wastewater.
Continue readingBig Cypress Airport, Big Cypress, Florida
Provided geotechnical evaluations and recommendations and materials testing and inspection for the rehabilitation of approximately 8000 LF of runway, including the installation of underdrains.
Continue readingDobbins Airbase COMPEC Repair Taxiway B and C & C-130 Apron, CMT, Marietta, Georgia
Provided Geotechnical Engineering and pavement design recommendations as well as construction materials testing and inspection for Taxiway B and C and C-130 Apron. Concrete testing, beam testing, straightedge/smoothness testing & compaction tests.
Continue readingHartsfield Jackson Deicing Facility, Atlanta, Georgia
Provided Engineering Services and construction materials testing and inspection for the construction of an aircraft apron and supporting facilities to provide a minimum of five unobstructed narrow-body deicing positions on the north airfield with the capability of deicing ten aircraft per hour. The project includes approximately 580,000 square feet of new apron pavement, approximately 100,000 square feet of pavement repairs, demolition of existing utilities and construction of new utilities, a 1.5 M gallon underground storage vault for spent glycol run-off, product storage tanks for Type I and Type IV glycol and diesel fuel, heaters for water, pumping facilities, and truck loading and unloading stations.
Continue reading