I-75 Interchange Improvements, Manatee and Sarasota Counties, Florida

Provided subsurface investigations, testing and foundation recommendations and associated reports for the modification of two interchanges (I-75 and Fruitville RD and I-75 and University Parkway). The project included ramp modifications, drainage, overhead lighting and signalization. The work was performed for FDOT District 1.

Continue reading

Hillsborough Transit Authority (HART) and Bus Rapid Transit (BRT) Consultant Services, Hillsborough County, Florida

Provided Geotechnical Engineering Recommendations Consisted of asphalt and concrete pavement cores and soils borings for roadway improvements, including retaining walls and adding totem poles and shelter structures at for several bus stops along Fletcher and Nebraska Avenues in Tampa, Florida.

Continue reading

SR 20 Widening and Improvements Cherokee and Forsyth Counties, Georgia

Provided Geotechnical Engineering Recommendations for the widening/reconstructing SR 20 from an existing two lane rural highway to a divided four-lane rural highway along SR 20 from SR 369 in Cherokee County to SR 371 in Forsyth County. The total length of the road is about 6.5 miles. Provided, Inc. performed pavement study and soil survey.

Continue reading