Provided geotechnical investigations and recommendations for the milling and resurfacing of this roadway in Pinellas County. The work was performed for FDOT District 7.
Continue readingJog Road Interchange at Florida’s Turnpike, Palm Beach County, Florida
Provided geotechnical engineering services on this project for the Florida Department of Transportation, Turnpike District. The project involves the design of a new Interchange at Jog Road and Florida’s Turnpike in Palm Beach County, Florida. The work was performed for FDOT Turnpike District.
Continue readingSR 951 Bridge @ Marco Island, Lee County, Florida
Provided geotechnical engineering on this project for the Florida Department of Transportation, District 1. The project involved the design of a new high level bridge, approximately 1500 feet in length. The work was performed for FDOT District 1.
Continue readingJameson Road Bridge Replacement, Hillsborough County, Florida
Provided subsurface investigations, testing and foundation recommendations and associated reports for the replacement of the Jamson Road Bridge over the Alafia River in Southeastern Hillsborough County. The work was performed for Hillsborough County, Florida.
Continue readingI-75 Interchange Improvements, Manatee and Sarasota Counties, Florida
Provided subsurface investigations, testing and foundation recommendations and associated reports for the modification of two interchanges (I-75 and Fruitville RD and I-75 and University Parkway). The project included ramp modifications, drainage, overhead lighting and signalization. The work was performed for FDOT District 1.
Continue readingHillsborough Transit Authority (HART) and Bus Rapid Transit (BRT) Consultant Services, Hillsborough County, Florida
Provided Geotechnical Engineering Recommendations Consisted of asphalt and concrete pavement cores and soils borings for roadway improvements, including retaining walls and adding totem poles and shelter structures at for several bus stops along Fletcher and Nebraska Avenues in Tampa, Florida.
Continue readingSR 20 Widening and Improvements Cherokee and Forsyth Counties, Georgia
Provided Geotechnical Engineering Recommendations for the widening/reconstructing SR 20 from an existing two lane rural highway to a divided four-lane rural highway along SR 20 from SR 369 in Cherokee County to SR 371 in Forsyth County. The total length of the road is about 6.5 miles. Provided, Inc. performed pavement study and soil survey.
Continue readingSR 105 at US 44, Habersham County, Georgia
Provided Geotechnical Engineering Recommendations for the Widening of SR105 from the intersection of Cannon Bridge Rd, west of SR 365 to Walnut Street in Cornelia for a total of 2.74 miles. In the project is the reconstruction of the interchange at US441/SR 105 and SR 365 as a diamond interchange. The construction widens US441/ SR 105 to a six- lane divided roadway with a 20′ raised median from Cannon Bridge road to SR 365.
Continue readingSR 155 Candler Rd, DeKalb County, Georgia
Provided Geotechnical Engineering Recommendations and pavement evaluations services on SR 155 Candler Road in DeKalb County. The total length of the project is 3.6 miles.
Continue readingSardis Rd Connector, Gainesville, Georgia
Provided geotechnical engineering services for the Sardis Rd Connector project in Gainesville GA. The project consisted of both a GDOT Soil Survey, and a Level II contamination screening at selected sites throughout the future roadway corridor. Our scope of services including soil survey and Level II Environmental Contamination Screening.
Continue reading