Provided subsurface investigations, recommendations and associated reports for the widening of US 41 @ Shell Point Road, 17th and 19th Avenues and along 19th Avenue in Hillsborough County. The work was performed for Hillsborough County, Florida.
Continue readingUS 41 Bypass, Sarasota County, Florida
Provided subsurface investigations, testing and foundation recommendations and associated reports for the reconstruction of US 41 Bypass. The limits of the project were from Center Road to Bird Bay Drive, a distance of approximately 2.3 miles. The work was performed for FDOT District 1.
Continue readingBayshore Boulevard, Hillsborough County, Florida
Provided Geotechnical Engineering Recommendations and subsurface investigations including pavement evaluation of existing pavement conditions at selected locations along Bayshore Boulevard in Hillsborough County, Florida. The work was performed for the City of Tampa, Florida.
Continue readingSR 590, Pinellas County, Florida
Provided geotechnical investigations and recommendations for the milling and resurfacing of this roadway in Pinellas County. The project also included new paved shoulders and extended from McMullen Booth Road to Main Street. The work was performed for FDOT District 7.
Continue readingImprovements to US 19 at Marine Parkway, Pinellas County, Florida
Provided geotechnical investigations and recommendations for the addition of left turn lanes at this intersection. The work was performed for FDOT District 7.
Continue readingAlternate US 19, Harry Street to Meres Boulevard, Pinellas County, Florida
Provided geotechnical investigations and recommendations for the milling and resurfacing of this roadway in Pinellas County. The work was performed for FDOT District 7.
Continue readingJog Road Interchange at Florida’s Turnpike, Palm Beach County, Florida
Provided geotechnical engineering services on this project for the Florida Department of Transportation, Turnpike District. The project involves the design of a new Interchange at Jog Road and Florida’s Turnpike in Palm Beach County, Florida. The work was performed for FDOT Turnpike District.
Continue readingSR 20 Widening and Improvements Cherokee and Forsyth Counties, Georgia
Provided Geotechnical Engineering Recommendations for the widening/reconstructing SR 20 from an existing two lane rural highway to a divided four-lane rural highway along SR 20 from SR 369 in Cherokee County to SR 371 in Forsyth County. The total length of the road is about 6.5 miles. Provided, Inc. performed pavement study and soil survey.
Continue readingSR 105 at US 44, Habersham County, Georgia
Provided Geotechnical Engineering Recommendations for the Widening of SR105 from the intersection of Cannon Bridge Rd, west of SR 365 to Walnut Street in Cornelia for a total of 2.74 miles. In the project is the reconstruction of the interchange at US441/SR 105 and SR 365 as a diamond interchange. The construction widens US441/ SR 105 to a six- lane divided roadway with a 20′ raised median from Cannon Bridge road to SR 365.
Continue readingSR 155 Candler Rd, DeKalb County, Georgia
Provided Geotechnical Engineering Recommendations and pavement evaluations services on SR 155 Candler Road in DeKalb County. The total length of the project is 3.6 miles.
Continue reading