Provided Geotechnical Engineering and pavement design recommendations as well as construction materials testing and inspection for Taxiway B and C and C-130 Apron. Concrete testing, beam testing, straightedge/smoothness testing & compaction tests.
Continue readingImprovements to US 19 at Marine Parkway, Pinellas County, Florida
Provided geotechnical investigations and recommendations for the addition of left turn lanes at this intersection. The work was performed for FDOT District 7.
Continue readingAlternate US 19, Harry Street to Meres Boulevard, Pinellas County, Florida
Provided geotechnical investigations and recommendations for the milling and resurfacing of this roadway in Pinellas County. The work was performed for FDOT District 7.
Continue readingHillsborough Transit Authority (HART) and Bus Rapid Transit (BRT) Consultant Services, Hillsborough County, Florida
Provided Geotechnical Engineering Recommendations Consisted of asphalt and concrete pavement cores and soils borings for roadway improvements, including retaining walls and adding totem poles and shelter structures at for several bus stops along Fletcher and Nebraska Avenues in Tampa, Florida.
Continue readingSR 20 Widening and Improvements Cherokee and Forsyth Counties, Georgia
Provided Geotechnical Engineering Recommendations for the widening/reconstructing SR 20 from an existing two lane rural highway to a divided four-lane rural highway along SR 20 from SR 369 in Cherokee County to SR 371 in Forsyth County. The total length of the road is about 6.5 miles. Provided, Inc. performed pavement study and soil survey.
Continue readingSR 155 Candler Rd, DeKalb County, Georgia
Provided Geotechnical Engineering Recommendations and pavement evaluations services on SR 155 Candler Road in DeKalb County. The total length of the project is 3.6 miles.
Continue readingI-85, SR 53 US 129/SR 11, Jackson County, Georgia
Provided pavement evaluations and recommendation services on Interstate I-85, SR 53 & US 129/SR 11 in Jackson County, Georgia. The total length of the study is Eight (8) miles in each direction. The scope of services included providing pavement condition surveys and pavement design evaluations along with Geotechnical Engineering Recommendations along I-85 main line north and south bounds and for the ramps at the interchange of SR 53 and interchange at SR 11.
Continue readingSR 101 for Various Project Segments, Floyd County, Georgia
Provided evaluation of the existing pavement conditions to support the Concept Development/Validation of various roadway projects along SR 101, to evaluate the need for overlay, full depth or reconstruction.
Continue readingSR 40 Connector 821, Charlton, Georgia
Provided Geotechnical Engineering Services for the roadway consisting of Pavement Evaluation, Soil Survey and Wall Foundation Recommendation along SR 40 from Conn/Folkston to MP 2.75/E of CR 82, Charlton Counties, GA. The total length of the roadway is approximately 1.9 miles. The project consists of approximately 1.9 miles of pavement overlay, about 1.75 miles of new pavement ranging from 2 to 3 lanes, and one (1) bridge culvert with retaining walls.
Continue readingSR 138 and I-85 Intersection Improvements and Interchange Design, Clayton County, Georgia
Provided geotechnical services for the existing Pavement Evaluation and Design at the SR 138 Jonesboro Road and I-85 intersection, Fulton County Georgia. The project included design of the mainline alignment as well as access ramps to and from the interstate. In addition, the project includes replacement of bridges/interchange on I-85.
Continue reading