Developed by C-43 Water Management Builders for the South Florida Water Management District (SFWMD) and U.S. Army Corps of Engineers (USACE), the C-43 West Basin Storage Reservoir is a 170,000-acre-foot infrastructure project designed to store excess freshwater from the Caloosahatchee River, stabilize salinity levels, and prevent algal blooms. MC Squared provided critical laboratory management, construction materials testing, and quality control, ensuring compliance with USACE standards. Our contributions—including testing 22 million cubic yards of embankment, 110,000 tons of soil-cement armoring, and 19 miles of soil-bentonite cutoff wall—have helped ensure the reservoir’s durability, reliability, and long-term impact on Florida’s water resources and communities.
Continue readingSnapfinger and Pole Bridge Creek Wastewater Treatment Plant Interplant Storage and Convergence Phases I & II, DeKalb County, Georgia
The tunnel itself is proposed to be approximately 5 miles long, have a 27-foot diameter, and have a storage volume of 88 million gallons. Tunnel horizon is to be located between 150 and 200 feet below ground surface. Apart from the tunnel itself, 50 million gallon per day influent lift stations will be located on either end at each wastewater treatment plant. The primary purpose of the investigation was to gather information that will serve as input and recommendations for the preferred tunnel alignment. MC2 evaluated and analyzed available geotechnical and hydro geological data and prepared a plan for additional drilling and testing. MC2 performed extensive soil drilling and rock coring along the proposed tunnel alignment. Using multiple drilling methods and drilling equipment, borings ranged from approximately 48 feet below ground surface to 275 feet below ground surface. We analyzed and logged all core data: including rock type, mineralogy, fracture type and degree, degree of weathering, Rock Quality Designation and Recovery Percentage. Rock core data, soils testing, depth to rock, and the continuous monitoring of the groundwater table allowed us to produce a detailed geologic map showing different lithologies and their connections, zones of fractured and week rock, and groundwater flow patterns. Other field tests performed included down-hole pressure testing in bedrock, falling head permeability tests, and geophysical testing in fractured problem areas to supplement drilling data. Laboratory testing of soils and bedrock samples included, but is not limited to, soil particle size analyses and % passing the 200 sieve, Liquid Limit and Plastic limit of soils, elastic moduli of intact rock core specimens, Brazilian tensile strength of rock core specimens, point load and compressive strength of intact rock core specimens at varying states of stress and temperature. Finally, our experienced professional engineers evaluated all the field and lab data collected and produced a geotechnical exploration report summarizing the methods used, and data collected along with recommendations for tunnel construction and alignment.
Walnut Creek Water Reclamation Facility LAS Expansion II, Henry County, Georgia
Provided construction materials testing and inspection for the Walnut Creek Water Reclamation Facility LAS Expansion II.
Continue readingBig Creek Treatment Plant, Fulton County, Georgia
Provided Geotechnical & Materials Consulting Engineering Services including recommendations for foundation design.
Continue readingNorth Oconee WWTP, Athens, Georgia
Provided Geotechnical investigation, soil classification and recommendations for foundation design.
Continue readingTampa Bay Water Regional Facility Site Pump Stations Expansion, Hillsborough County, Florida
Provided materials testing of soils, concrete and asphalt for this expansion project, which includes a new sodium hypochlorite storage and feed building, new chemical mixing station, reservoir flow control and metering station, yard piping and civil grading and paving.
Continue readingTampa Bay Water Bypass Canal Pump Station Expansion, Hillsborough County, Florida
Provided materials testing of soils, concrete and asphalt for this expansion project, which includes a new electrical building, new pump building, yard piping and civil grading and paving.
Continue readingHollywood Water Treatment Plan, Hollywood, Florida
Provided subsurface investigations and associated foundation recommendations for the Water Treatment Plant additions at the Hollywood Seminole Indian Reservation. In addition, we provided materials testing of soils and concrete on the construction phase of the project. Project components include a new clearwell, process/administration building, generator building, chemical storage area, degasifier/transfer pump station and associated piping.
Continue readingBig Cypress Water Treatment Plant, Big Cypress, Florida
Provided subsurface investigations and associated foundation recommendations for a new Waste Water Treatment Plant at the Big Cypress Seminole Indian Reservation. In addition, we provided materials testing of soils and concrete on the construction phase of the project. Project components include WTP process building, stormdrain detention facility, clearwell and a concentrate/disposal storm percolation pond along with associated piping.
Continue readingBrighton Water Treatment Plant, Brighton, Florida
Provided subsurface investigations and associated foundation recommendations for a new Water Treatment Plant at the Brighton Seminole Reservation. In addition, we also provided materials testing of soils and concrete on the construction phase of the project. Project components include a new clearwell, process/administration building, generator building, chemical storage area, degasifier/transfer pump station and associated piping.
Continue reading