Provided comprehensive geotechnical explorations, seismic study, and foundations evaluations and recommendations. Our recommendations consisted of deep foundations and shallow mat foundations. The project is a seven (7.0) million gallon (MG) buried underground stormwater vault retention consisting of cast-in-place concrete beams, columns with side walls, overflow weir and box culvert by-pass to storage vault. The foot print of the vault is approximately 90,000 square feet. In addition, we provided design recommendations for the proposed stormwater pond area which is approximately 780,000 square feet and is located on the SW corner of the intersection of Martin and Little Streets, Atlanta, Georgia.
City of Augusta J.B. Messerly Water Pollution Control Plant (WPCP), Augusta, Georgia
Provided engineering recommendations and construction oversight, management & inspection and construction materials testing of soils, concrete and asphalt for the JB Messerly WTP. Construction costs $80 million.
Continue readingCity of Augusta Highland Avenue WTP, Augusta, Georgia
Provided consulting engineering, construction oversight, management & inspection and construction materials testing and engineering recommendations of soils, concrete and asphalt for the Highland Avenue WTP. Construction costs $70 million.
Continue readingE.L. Huie Jr. Constructed Wetlands Phases 1-4, Clayton County, Georgia
Provided Geotechnical Engineering Recommendations and construction materials testing and inspection for the 100 acres natural effluent treatment facility. The project consists of building an impoundment (earthen dam) to treat wastewater.
Continue readingE.L. Huie Jr. Constructed Wetlands Phases 1-4, Clayton County, Georgia
Provided Geotechnical Engineering Recommendations and construction materials testing and inspection for the 100 acres natural effluent treatment facility. The project consists of building an impoundment (earthen dam) to treat wastewater.
Continue readingTampa International Airport Phase 3 Warehouse
Provided geotechnical investigations and recommendations for a new 35,000 SF warehouse and associated support facilities including an outdoor storage area, parking areas and a stormwater retention pond.
Continue readingBig Cypress Airport, Big Cypress, Florida
Provided geotechnical evaluations and recommendations and materials testing and inspection for the rehabilitation of approximately 8000 LF of runway, including the installation of underdrains.
Continue readingTampa International Airport Airside F Boarding Bridges, PCA AHU and GPU Replacements Gates 88 through 90, Hillsborough County Aviation Authority, Tampa, Florida
Provided geotechnical engineering and foundation recommendations for the structures included in the upgrade for Gates 88 through 90.
Continue readingOrlando International Airport BP 424 Rehabilitation of Taxiways B, E & J, Orlando, Florida
Provided engineering services including materials testing of soils, concrete and asphalt. Specific testing included limerock base, subbase and subgrade, embankment, pipe and conduit backfill and concrete field testing.
Continue readingRegional Airport Air Carrier and General Aviation Apron Reconstruction, Augusta, Georgia
Provided Geotechnical Engineering Recommendations for the Air Carrier removal and replacement of approximately 4.1 acres of existing apron to the east and north of the Terminal and Airport General Aviation Apron, the project includes the removal and replacement of approximately 9.35 acres of existing pavement to the east and north of the Terminal.
Continue reading