Provided geotechnical exploration, laboratory testing and engineering recommendations for the Snapfinger Wastewater Treatment Plant Dewatering Building.
Continue readingCuster Avenue CSO Relief Storage Vault City of Atlanta, Fulton County, Georgia
Provided comprehensive geotechnical engineering services for the Custer Avenue CSO Relief Storage Vault project which were performed in two Phases. We evaluated the soil conditions and groundwater levels at the site, and provided recommendations concerning site development and foundation design and construction recommendations for the proposed storage vault. The proposed vault is a new five (5) million gallon buried underground stormwater vault retention consisting of cast-in-place concrete with side walls, overflow weir and box culvert by-pass to storage vault. The foot print of the vault is 58,000 square feet, City of Atlanta, Georgia.
Continue readingConnally Storage Vault City of Atlanta, Fulton County, Georgia
Provided comprehensive geotechnical explorations, seismic study, and foundations evaluations and recommendations. Our recommendations consisted of deep foundations and shallow mat foundations. The project is a seven (7.0) million gallon (MG) buried underground stormwater vault retention consisting of cast-in-place concrete beams, columns with side walls, overflow weir and box culvert by-pass to storage vault. The foot print of the vault is approximately 90,000 square feet. In addition, we provided design recommendations for the proposed stormwater pond area which is approximately 780,000 square feet and is located on the SW corner of the intersection of Martin and Little Streets, Atlanta, Georgia.
City of Augusta J.B. Messerly Water Pollution Control Plant (WPCP), Augusta, Georgia
Provided engineering recommendations and construction oversight, management & inspection and construction materials testing of soils, concrete and asphalt for the JB Messerly WTP. Construction costs $80 million.
Continue readingCity of Augusta Highland Avenue WTP, Augusta, Georgia
Provided consulting engineering, construction oversight, management & inspection and construction materials testing and engineering recommendations of soils, concrete and asphalt for the Highland Avenue WTP. Construction costs $70 million.
Continue readingE.L. Huie Jr. Constructed Wetlands Phases 1-4, Clayton County, Georgia
Provided Geotechnical Engineering Recommendations and construction materials testing and inspection for the 100 acres natural effluent treatment facility. The project consists of building an impoundment (earthen dam) to treat wastewater.
Continue readingE.L. Huie Jr. Constructed Wetlands Phases 1-4, Clayton County, Georgia
Provided Geotechnical Engineering Recommendations and construction materials testing and inspection for the 100 acres natural effluent treatment facility. The project consists of building an impoundment (earthen dam) to treat wastewater.
Continue readingTampa International Airport Phase 3 Warehouse
Provided geotechnical investigations and recommendations for a new 35,000 SF warehouse and associated support facilities including an outdoor storage area, parking areas and a stormwater retention pond.
Continue readingBig Cypress Airport, Big Cypress, Florida
Provided geotechnical evaluations and recommendations and materials testing and inspection for the rehabilitation of approximately 8000 LF of runway, including the installation of underdrains.
Continue readingTampa International Airport Airside F Boarding Bridges, PCA AHU and GPU Replacements Gates 88 through 90, Hillsborough County Aviation Authority, Tampa, Florida
Provided geotechnical engineering and foundation recommendations for the structures included in the upgrade for Gates 88 through 90.
Continue reading