Provided comprehensive geotechnical engineering services for the Custer Avenue CSO Relief Storage Vault project which were performed in two Phases. We evaluated the soil conditions and groundwater levels at the site, and provided recommendations concerning site development and foundation design and construction recommendations for the proposed storage vault. The proposed vault is a new five (5) million gallon buried underground stormwater vault retention consisting of cast-in-place concrete with side walls, overflow weir and box culvert by-pass to storage vault. The foot print of the vault is 58,000 square feet, City of Atlanta, Georgia.
Continue readingConnally Storage Vault City of Atlanta, Fulton County, Georgia
Provided comprehensive geotechnical explorations, seismic study, and foundations evaluations and recommendations. Our recommendations consisted of deep foundations and shallow mat foundations. The project is a seven (7.0) million gallon (MG) buried underground stormwater vault retention consisting of cast-in-place concrete beams, columns with side walls, overflow weir and box culvert by-pass to storage vault. The foot print of the vault is approximately 90,000 square feet. In addition, we provided design recommendations for the proposed stormwater pond area which is approximately 780,000 square feet and is located on the SW corner of the intersection of Martin and Little Streets, Atlanta, Georgia.
Hartsfield Jackson Deicing Facility, Atlanta, Georgia
Provided Engineering Services and construction materials testing and inspection for the construction of an aircraft apron and supporting facilities to provide a minimum of five unobstructed narrow-body deicing positions on the north airfield with the capability of deicing ten aircraft per hour. The project includes approximately 580,000 square feet of new apron pavement, approximately 100,000 square feet of pavement repairs, demolition of existing utilities and construction of new utilities, a 1.5 M gallon underground storage vault for spent glycol run-off, product storage tanks for Type I and Type IV glycol and diesel fuel, heaters for water, pumping facilities, and truck loading and unloading stations.
Continue readingCOA SAG II Phase I Permeable Pavers City of Atlanta, Fulton County, Georgia
Provided geotechnical engineering services for the installation of permeable interlocking concrete pavers (PICP) on top of open graded aggregate. The objective of this study is to provide the information for the design of green infrastructure stormwater improvement solution to mitigate local flooding.
Continue readingSR 120 (Abbotts Bridge Road) City of Johns Creek, Fulton County, Georgia
Provided geotechnical services for the existing Pavement Evaluation and Design and Soil Survey along the roadway along SR 120, Abbotts Bridge Road, City of Johns Creek, Fulton County Georgia. The scope included coring of pavement along the project alignment, evaluation of the existing asphalt condition and thickness based on the cores taken, the analyses of existing base and/or subbase materials and performing pavement design for full depth replacement and overlay designs per GDOT requirements.
Continue reading