SR 155 Candler Rd, DeKalb County, Georgia
Provided Geotechnical Engineering Recommendations and pavement evaluations services on SR 155 Candler Road in DeKalb County. The total length of the project is 3.6 miles.
MC Squared provides comprehensive support for transportation infrastructure projects. With specialized expertise in geotechnical analysis, pavement design, materials testing, and construction management, the firm ensures that structures perform safely and effectively under continuous demand.
We are committed to delivering cost‐effective solutions that stand the test of time, integrating advanced design concepts with proven construction management practices. From local street enhancements to major highways and bridges, the firm emphasizes sustainability and resilience, working closely with public agencies and private stakeholders to mitigate congestion, reduce emissions, and promote public safety.
By employing cutting‐edge tools and leveraging deep industry knowledge, we consistently meet accelerated schedules, adhere to rigorous regulatory requirements, and support the development of reliable, robust transportation networks.
6.01(a), 6.01(b), 6.02, 6.03, 6.04(a), 6.04(b), 6.05
8.01, 8.02
9.01, 9.02, 9.03
9.1 , 9.2, 9.3, 9.4.1, 9.4.2, 9.5
10.1, 10.3
Provided Geotechnical Engineering Recommendations and pavement evaluations services on SR 155 Candler Road in DeKalb County. The total length of the project is 3.6 miles.
Provided Geotechnical Engineering Recommendations for the Widening of SR105 from the intersection of Cannon Bridge Rd, west of SR 365 to Walnut Street in Cornelia for a total of 2.74 miles. In the project is the reconstruction of the interchange at US441/SR 105 and SR 365 as a diamond interchange. The construction widens US441/ SR 105 to a six- lane divided roadway with a 20′ raised median from Cannon Bridge road to SR 365.
Provided geotechnical services for the existing Pavement Evaluation and Design at the SR 138 Jonesboro Road and I-85 intersection, Fulton County Georgia. The project included design of the mainline alignment as well as access ramps to and from the interstate. In addition, the project includes replacement of bridges/interchange on I-85.
Provided geotechnical engineering on this project for the Florida Department of Transportation, District 1. The project involved the design of a new high level bridge, approximately 1500 feet in length. The work was performed for FDOT District 1.
Provided geotechnical investigations and recommendations for the addition of left turn lanes at this intersection. The work was performed for FDOT District 7.