I-4 at SR 33 Interchange in Polk County, Florida
MC Squared is serving Lane Construction and the Florida Department of Transportation (FDOT) as the Construction Support subcontractor for the I-4 and SR 33 Interchange
MC Squared provides comprehensive support for transportation infrastructure projects. With specialized expertise in geotechnical analysis, pavement design, materials testing, and construction management, the firm ensures that structures perform safely and effectively under continuous demand.
We are committed to delivering cost‐effective solutions that stand the test of time, integrating advanced design concepts with proven construction management practices. From local street enhancements to major highways and bridges, the firm emphasizes sustainability and resilience, working closely with public agencies and private stakeholders to mitigate congestion, reduce emissions, and promote public safety.
By employing cutting‐edge tools and leveraging deep industry knowledge, we consistently meet accelerated schedules, adhere to rigorous regulatory requirements, and support the development of reliable, robust transportation networks.
6.01(a), 6.01(b), 6.02, 6.03, 6.04(a), 6.04(b), 6.05
8.01, 8.02
9.01, 9.02, 9.03
9.1 , 9.2, 9.3, 9.4.1, 9.4.2, 9.5
10.1, 10.3
MC Squared is serving Lane Construction and the Florida Department of Transportation (FDOT) as the Construction Support subcontractor for the I-4 and SR 33 Interchange
Provided geotechnical engineering on this project for the Florida Department of Transportation, District 1. The project involved the design of a new high level bridge, approximately 1500 feet in length. The work was performed for FDOT District 1.
Provided geotechnical investigations and recommendations for the foundation design and construction of two separate bridges at US 27 and Custer Road, Muscogee County, Columbus, Georgia. Two Bridge Foundation Investigations were performed for two span bridge and three span bridge for future roadway and bridge construction and improvements. The scope included Static Pile Bearing Capacity Analysis for multiple pile types, soil design parameter analysis and reporting, as well as the foundation investigation for multiple MSE walls to accompany bridge construction.
Provided Geotechnical Engineering Recommendations Consisted of asphalt and concrete pavement cores and soils borings for roadway improvements, including retaining walls and adding totem poles and shelter structures at for several bus stops along Fletcher and Nebraska Avenues in Tampa, Florida.
Provided Geotechnical Engineering Recommendations and subsurface investigations including pavement evaluation of existing pavement conditions at selected locations along Bayshore Boulevard in Hillsborough County, Florida. The work was performed for the City of Tampa, Florida.
MC Squared (MC²) is supporting Lowe Engineers on a roadway widening improvement project along CR 817, Lee Road, and South Sweetwater Road in Douglas County,