Provided pavement evaluations and recommendation services on Interstate I-85, SR 53 & US 129/SR 11 in Jackson County, Georgia. The total length of the study is Eight (8) miles in each direction. The scope of services included providing pavement condition surveys and pavement design evaluations along with Geotechnical Engineering Recommendations along I-85 main line north and south bounds and for the ramps at the interchange of SR 53 and interchange at SR 11.
Continue readingSR 101 for Various Project Segments, Floyd County, Georgia
Provided evaluation of the existing pavement conditions to support the Concept Development/Validation of various roadway projects along SR 101, to evaluate the need for overlay, full depth or reconstruction.
Continue readingSR 40 Widening 820, Charlton/Camden, Georgia
Provided Geotechnical Engineering Recommendations for the roadway consisting of Pavement Evaluation, Soil Survey and Wall Foundation Recommendation along SR 40 east of St. Mary’s cutoff/MP 5.0/Charlton to CR 61 in Camden and Charlton Counties, GA. The total length of the roadway is approximately 11.67 miles. The project consists of approximately 10.2 miles of pavement overlay, 11.67 miles of new pavement ranging from 2 to 4 lanes, and five (5) culvert extensions. Approximately 2.2 miles of wetland area exists along the project alignment.
Continue readingSR 138 and I-85 Intersection Improvements and Interchange Design, Clayton County, Georgia
Provided geotechnical services for the existing Pavement Evaluation and Design at the SR 138 Jonesboro Road and I-85 intersection, Fulton County Georgia. The project included design of the mainline alignment as well as access ramps to and from the interstate. In addition, the project includes replacement of bridges/interchange on I-85.
Continue readingSR 120 (Abbotts Bridge Road) City of Johns Creek, Fulton County, Georgia
Provided geotechnical services for the existing Pavement Evaluation and Design and Soil Survey along the roadway along SR 120, Abbotts Bridge Road, City of Johns Creek, Fulton County Georgia. The scope included coring of pavement along the project alignment, evaluation of the existing asphalt condition and thickness based on the cores taken, the analyses of existing base and/or subbase materials and performing pavement design for full depth replacement and overlay designs per GDOT requirements.
Continue readingUS 27 at Cluster Road, Muscogee County, Columbus, Georgia
Provided geotechnical investigations and recommendations for the foundation design and construction of two separate bridges at US 27 and Custer Road, Muscogee County, Columbus, Georgia. Two Bridge Foundation Investigations were performed for two span bridge and three span bridge for future roadway and bridge construction and improvements. The scope included Static Pile Bearing Capacity Analysis for multiple pile types, soil design parameter analysis and reporting, as well as the foundation investigation for multiple MSE walls to accompany bridge construction.
Continue reading