Provided construction inspection and testing of various components of the Water Treatment Plant at the WB Casey WTP. Services included construction oversight and inspection.
Continue readingPoint Peter Wastewater Treatment Plant Expansion 1.8 to 4.0 MGD & Phase II 4 MG Expansion, St. Marys, Georgia
Provided geotechnical and foundation recommendations for the project vicinity, conduct soil drilling & make recommendations for the foundation design. Also, provided construction oversight, value engineering and inspection. Provided construction materials testing and inspection during Vibro-Replacement for the Biological Treatment and Effluent Pump Station Structures.
Continue readingScott Chandler Reservoir, DeKalb County, Georgia
Served as the owner’s representative onsite as well as providing construction materials testing and inspection services, such as concrete and soils testing, and offsite lab concrete compression testing. Also provided remediation solutions associated with the removal and replacement of a 24” groundwater runoff drain pipe on the northside of the reservoir dam.
Continue readingCity of Atlanta Combined Sewer Outflow, Atlanta, Georgia
Provided subsurface investigations and associated recommendations for this project which was intended to improve the water quality of the effluent from the Combined Sewer Outfall (CSO) system of the Stockade sub-basin in southeast Atlanta. The plan included the design of approximately 52,000 LF of new sanitary sewer and 11,000 LF of new storm sewers including tunneling under I-20.
Continue readingSnapfinger Pole Bridge Station, DeKalb County, Georgia
Provided the planned structures included an electrical building, an odor control building, and a wet well for the proposed pump station The wet well shaft was approximately 200 feet deep with circular concrete walls to house pumps and store wastewater.The excavation for the shaft consisted of open cut to top of rock followed by rock excavation by blasting or by shoring the excavation using soldier piles and lagging system. We performed geotechnical explorations, rock coring and laboratory testing to arrive with the most cost-effective foundation system to support the construction.
Continue readingVarious Phases of the Quarles Plant Cobb County, Georgia
Provided geotechnical exploration, laboratory testing and engineering foundation recommendations for the expansion at the James E. Quarles Water Treatment Plant.We also provided construction materials testing and inspection services and provide foundation consulting services and recommendations for the excavation and installations of the foundations. MC Squared, Inc. evaluated the viability of the existing concrete tanks to be re-used as part of the rehabilitation of the plant Performed Ultrasonic Assessment of the concrete tank using a V-Meter.
Continue readingSnapfinger WWTP Dewatering Building Decatur, Georgia
Provided geotechnical exploration, laboratory testing and engineering recommendations for the Snapfinger Wastewater Treatment Plant Dewatering Building.
Continue readingCuster Avenue CSO Relief Storage Vault City of Atlanta, Fulton County, Georgia
Provided comprehensive geotechnical engineering services for the Custer Avenue CSO Relief Storage Vault project which were performed in two Phases. We evaluated the soil conditions and groundwater levels at the site, and provided recommendations concerning site development and foundation design and construction recommendations for the proposed storage vault. The proposed vault is a new five (5) million gallon buried underground stormwater vault retention consisting of cast-in-place concrete with side walls, overflow weir and box culvert by-pass to storage vault. The foot print of the vault is 58,000 square feet, City of Atlanta, Georgia.
Continue readingConnally Storage Vault City of Atlanta, Fulton County, Georgia
Provided comprehensive geotechnical explorations, seismic study, and foundations evaluations and recommendations. Our recommendations consisted of deep foundations and shallow mat foundations. The project is a seven (7.0) million gallon (MG) buried underground stormwater vault retention consisting of cast-in-place concrete beams, columns with side walls, overflow weir and box culvert by-pass to storage vault. The foot print of the vault is approximately 90,000 square feet. In addition, we provided design recommendations for the proposed stormwater pond area which is approximately 780,000 square feet and is located on the SW corner of the intersection of Martin and Little Streets, Atlanta, Georgia.
City of Augusta J.B. Messerly Water Pollution Control Plant (WPCP), Augusta, Georgia
Provided engineering recommendations and construction oversight, management & inspection and construction materials testing of soils, concrete and asphalt for the JB Messerly WTP. Construction costs $80 million.
Continue reading