The tunnel itself is proposed to be approximately 5 miles long, have a 27-foot diameter, and have a storage volume of 88 million gallons. Tunnel horizon is to be located between 150 and 200 feet below ground surface. Apart from the tunnel itself, 50 million gallon per day influent lift stations will be located on either end at each wastewater treatment plant. The primary purpose of the investigation was to gather information that will serve as input and recommendations for the preferred tunnel alignment. MC2 evaluated and analyzed available geotechnical and hydro geological data and prepared a plan for additional drilling and testing. MC2 performed extensive soil drilling and rock coring along the proposed tunnel alignment. Using multiple drilling methods and drilling equipment, borings ranged from approximately 48 feet below ground surface to 275 feet below ground surface. We analyzed and logged all core data: including rock type, mineralogy, fracture type and degree, degree of weathering, Rock Quality Designation and Recovery Percentage. Rock core data, soils testing, depth to rock, and the continuous monitoring of the groundwater table allowed us to produce a detailed geologic map showing different lithologies and their connections, zones of fractured and week rock, and groundwater flow patterns. Other field tests performed included down-hole pressure testing in bedrock, falling head permeability tests, and geophysical testing in fractured problem areas to supplement drilling data. Laboratory testing of soils and bedrock samples included, but is not limited to, soil particle size analyses and % passing the 200 sieve, Liquid Limit and Plastic limit of soils, elastic moduli of intact rock core specimens, Brazilian tensile strength of rock core specimens, point load and compressive strength of intact rock core specimens at varying states of stress and temperature. Finally, our experienced professional engineers evaluated all the field and lab data collected and produced a geotechnical exploration report summarizing the methods used, and data collected along with recommendations for tunnel construction and alignment.
Tampa International Airport Phase 3 Warehouse
Provided geotechnical investigations and recommendations for a new 35,000 SF warehouse and associated support facilities including an outdoor storage area, parking areas and a storm water retention pond.
Continue readingClayton County Senior Center, Clayton County International Park, Georgia
Provided Geotechnical Engineering Recommendations for the construction of three (3) separate single-story structures that totaled 28,700 SF, therapeutic pool, driveways and associated parking. Additionally, we provided construction inspection and testing during the construction.
Continue readingClayton County Senior Center, Clayton County, Georgia
Provided Geotechnical and Foundations Recommendations as well as construction materials testing, inspection and consulting engineering for the construction of over 40,000 square feet building and one swimming pool.
Continue readingClayton County Rex Center, Clayton County, Georgia
Provided Geotechnical and Foundations Recommendations as well as construction materials testing, inspection and consulting engineering for the construction of over 40,000 SF building and one swimming pool.
Continue readingClayton County Aquatic Center, Clayton County, Georgia
Provided construction oversight, management and materials testing, inspection and consulting engineering for the construction of over 40,000 SF building and two swimming pools.
South Fulton Library-Fulton County, Georgia
Provided geotechnical engineering services for a future Library to be built in South Fulton County GA. The library consisted of the Renovation and Expansion of the building and the parking lot that adds 10,000 SF to the existing 15,000 sf structure for a total renovation and expansion of 25,000 SF for this branch library.
Georgia Tech, Atlanta, Georgia – Bunger Henry/Petit Gas Storage Project
Provided onsite construction inspection and materials testing.
Continue readingStewart Lakewood Library-Fulton County, Georgia
Provided geotechnical engineering services and foundations recommendations during the design phase. Additionally, we provided full time construction inspection and testing including NPDES monitoring.
Continue readingPalmetto Library-Fulton County, Georgia
Provided geotechnical engineering services and foundations recommendations during the design phase. Additionally, we provided full time construction inspection and testing including NPDES monitoring.
Continue reading