Alternate US 19, Harry Street to Meres Boulevard, Pinellas County, Florida
Provided geotechnical investigations and recommendations for the milling and resurfacing of this roadway in Pinellas County. The work was performed for FDOT District 7.
MC Squared offers practical and cost-effective design recommendations, drawing on the extensive experience of our staff in advanced data gathering, engineering analysis, and design. By combining cutting-edge technology with practical engineering knowledge, we provide valuable services to the design team, ensuring the project’s success. Our principals have significant experience working on pavement design projects for interstate, arterial, and local roadways in Florida, Georgia, and South Carolina.
We have successfully completed a variety of projects, ranging from simple to complex, in the following areas:
Provided geotechnical investigations and recommendations for the milling and resurfacing of this roadway in Pinellas County. The work was performed for FDOT District 7.
Provided Geotechnical Engineering Services for the roadway consisting of Pavement Evaluation, Soil Survey and Wall Foundation Recommendation along SR 40 from Conn/Folkston to MP 2.75/E of CR 82, Charlton Counties, GA. The total length of the roadway is approximately 1.9 miles. The project consists of approximately 1.9 miles of pavement overlay, about 1.75 miles of new pavement ranging from 2 to 3 lanes, and one (1) bridge culvert with retaining walls.
Provided Geotechnical Engineering Services for the reconstruction of approximately 2650 linear feet of Taxiway A from the north end of Runway 17/35 to the intersection with Taxiway B, the extension of Taxiway A from Taxiway B in a southern direction towards Taxiway E, and Pavement Reconstruction for the Airport Fire Station.
Provided geotechnical services for the project which consisted of the following: Bridge Foundation Investigation, Wall Foundation Investigations, Soil Survey, and full Pavement Evaluation and Design. The project is located in Riverdale, Clayton County Georgia.
Provided pavement evaluations and recommendation services on Interstate I-85, SR 53 & US 129/SR 11 in Jackson County, Georgia. The total length of the study is Eight (8) miles in each direction. The scope of services included providing pavement condition surveys and pavement design evaluations along with Geotechnical Engineering Recommendations along I-85 main line north and south bounds and for the ramps at the interchange of SR 53 and interchange at SR 11.
Provided Geotechnical Engineering Recommendations for the widening/reconstructing SR 20 from an existing two lane rural highway to a divided four-lane rural highway along SR 20 from SR 369 in Cherokee County to SR 371 in Forsyth County. The total length of the road is about 6.5 miles. Provided, Inc. performed pavement study and soil survey.