Walnut Creek Water Reclamation Facility LAS Expansion II, Henry County, Georgia
Provided construction materials testing and inspection for the Walnut Creek Water Reclamation Facility LAS Expansion II.
MC Squared provides specialized geotechnical and materials testing services for water and wastewater infrastructure projects. Our expertise supports the development of reservoirs, treatment facilities, pump stations, and distribution systems, ensuring structural integrity and long-term performance under varying environmental conditions.
We prioritize cost-effective, sustainable solutions that enhance water quality, protect public health, and improve system reliability. Our team collaborates with municipalities, utilities, and engineering firms to optimize designs, mitigate risks, and support regulatory compliance throughout the project lifecycle.
Through advanced testing methodologies and a deep understanding of subsurface conditions, we help deliver resilient infrastructure that efficiently manages water resources and withstands future demand.
Provided construction materials testing and inspection for the Walnut Creek Water Reclamation Facility LAS Expansion II.
Provided comprehensive geotechnical explorations, seismic study, and foundations evaluations and recommendations. Our recommendations consisted of deep foundations and shallow mat foundations. The project is a seven
Provided subsurface investigations and associated recommendations for 2 new 800,000 gallon tanks, 1 new 250,000 gallon tank, an elevated walkway and miscellaneous site piping for the existing water treatment facility.
Provided the planned structures included an electrical building, an odor control building, and a wet well for the proposed pump station The wet well shaft was approximately 200 feet deep with circular concrete walls to house pumps and store wastewater.The excavation for the shaft consisted of open cut to top of rock followed by rock excavation by blasting or by shoring the excavation using soldier piles and lagging system. We performed geotechnical explorations, rock coring and laboratory testing to arrive with the most cost-effective foundation system to support the construction.
Provided subsurface investigations and associated foundation recommendations for a new Waste Water Treatment Plant at the Big Cypress Seminole Indian Reservation. In addition, we provided materials testing of soils and concrete on the construction phase of the project. Project components include WTP process building, stormdrain detention facility, clearwell and a concentrate/disposal storm percolation pond along with associated piping.
Provided geotechnical exploration, laboratory testing and engineering recommendations for the Snapfinger Wastewater Treatment Plant Dewatering Building.