MC Squared provides comprehensive support for transportation infrastructure projects. With specialized expertise in geotechnical analysis, pavement design, materials testing, and construction management, the firm ensures that structures perform safely and effectively under continuous demand.

We are committed to delivering cost‐effective solutions that stand the test of time, integrating advanced design concepts with proven construction management practices. From local street enhancements to major highways and bridges, the firm emphasizes sustainability and resilience, working closely with public agencies and private stakeholders to mitigate congestion, reduce emissions, and promote public safety.

By employing cutting‐edge tools and leveraging deep industry knowledge, we consistently meet accelerated schedules, adhere to rigorous regulatory requirements, and support the development of reliable, robust transportation networks.

GDOT Prequalifications

6.01(a),  6.01(b), 6.02, 6.03, 6.04(a),  6.04(b),  6.05 

8.01,  8.02 

9.01, 9.02, 9.03 

FDOT Prequalifications

9.1 , 9.2,  9.3, 9.4.1, 9.4.2, 9.5 

10.1, 10.3 

scDOT Prequalifications

TRANSPORTATION PROJECTS

TRANSPORTATION
PROJECTS

I-75 Interchange Improvements, Manatee and Sarasota Counties, Florida

Provided subsurface investigations, testing and foundation recommendations and associated reports for the modification of two interchanges (I-75 and Fruitville RD and I-75 and University Parkway). The project included ramp modifications, drainage, overhead lighting and signalization. The work was performed for FDOT District 1.

SR 40 Connector 821, Charlton, Georgia

Provided Geotechnical Engineering Services for the roadway consisting of Pavement Evaluation, Soil Survey and Wall Foundation Recommendation along SR 40 from Conn/Folkston to MP 2.75/E of CR 82, Charlton Counties, GA. The total length of the roadway is approximately 1.9 miles. The project consists of approximately 1.9 miles of pavement overlay, about 1.75 miles of new pavement ranging from 2 to 3 lanes, and one (1) bridge culvert with retaining walls.

SR 105 at US 44, Habersham County, Georgia

Provided Geotechnical Engineering Recommendations for the Widening of SR105 from the intersection of Cannon Bridge Rd, west of SR 365 to Walnut Street in Cornelia for a total of 2.74 miles. In the project is the reconstruction of the interchange at US441/SR 105 and SR 365 as a diamond interchange. The construction widens US441/ SR 105 to a six- lane divided roadway with a 20′ raised median from Cannon Bridge road to SR 365.

Georgia Power Project – Bridge Foundation Investigation, Bartow County, Georgia

The project consisted of the design of two (2) new bridges over Euharlee Creek in Bartow County, Georgia, which is known to be prone to sinkhole development. We performed geotechnical investigations and foundation engineering recommendations for the deep foundation system for the project. We performed Geophysical study including Electrical Resistivity Survey at the site which confirmed that several Karst anomalies existed. We provided remediation plan consisting of grout injection. Our foundation recommendations included H-piles. Geophysical testing, minimum pile tip elevation based on compression/tension and pile installation criteria. We provided quality control inspection and testing for the entire duration of the project.