I-4 at SR 33 Interchange in Polk County, Florida
MC Squared is serving Lane Construction and the Florida Department of Transportation (FDOT) as the Construction Support subcontractor for the I-4 and SR 33 Interchange
MC Squared provides comprehensive support for transportation infrastructure projects. With specialized expertise in geotechnical analysis, pavement design, materials testing, and construction management, the firm ensures that structures perform safely and effectively under continuous demand.
We are committed to delivering cost‐effective solutions that stand the test of time, integrating advanced design concepts with proven construction management practices. From local street enhancements to major highways and bridges, the firm emphasizes sustainability and resilience, working closely with public agencies and private stakeholders to mitigate congestion, reduce emissions, and promote public safety.
By employing cutting‐edge tools and leveraging deep industry knowledge, we consistently meet accelerated schedules, adhere to rigorous regulatory requirements, and support the development of reliable, robust transportation networks.
6.01(a), 6.01(b), 6.02, 6.03, 6.04(a), 6.04(b), 6.05
8.01, 8.02
9.01, 9.02, 9.03
9.1 , 9.2, 9.3, 9.4.1, 9.4.2, 9.5
10.1, 10.3
MC Squared is serving Lane Construction and the Florida Department of Transportation (FDOT) as the Construction Support subcontractor for the I-4 and SR 33 Interchange
Provided subsurface investigations, recommendations and associated reports for the widening of US 41 @ Shell Point Road, 17th and 19th Avenues and along 19th Avenue in Hillsborough County. The work was performed for Hillsborough County, Florida.
Provided geotechnical engineering on this project for the Florida Department of Transportation, District 1. The project involved the design of a new high level bridge, approximately 1500 feet in length. The work was performed for FDOT District 1.
MC Squared (MC²) is supporting Lowe Engineers on a roadway widening improvement project along CR 817, Lee Road, and South Sweetwater Road in Douglas County,
Provided Geotechnical Engineering Recommendations for the roadway consisting of Pavement Evaluation, Soil Survey and Wall Foundation Recommendation along SR 40 east of St. Mary’s cutoff/MP 5.0/Charlton to CR 61 in Camden and Charlton Counties, GA. The total length of the roadway is approximately 11.67 miles. The project consists of approximately 10.2 miles of pavement overlay, 11.67 miles of new pavement ranging from 2 to 4 lanes, and five (5) culvert extensions. Approximately 2.2 miles of wetland area exists along the project alignment.
Provided subsurface investigations, testing and foundation recommendations and associated reports for the modification of two interchanges (I-75 and Fruitville RD and I-75 and University Parkway). The project included ramp modifications, drainage, overhead lighting and signalization. The work was performed for FDOT District 1.