SR 155 Candler Rd, DeKalb County, Georgia
Provided Geotechnical Engineering Recommendations and pavement evaluations services on SR 155 Candler Road in DeKalb County. The total length of the project is 3.6 miles.
MC Squared provides comprehensive support for transportation infrastructure projects. With specialized expertise in geotechnical analysis, pavement design, materials testing, and construction management, the firm ensures that structures perform safely and effectively under continuous demand.
We are committed to delivering cost‐effective solutions that stand the test of time, integrating advanced design concepts with proven construction management practices. From local street enhancements to major highways and bridges, the firm emphasizes sustainability and resilience, working closely with public agencies and private stakeholders to mitigate congestion, reduce emissions, and promote public safety.
By employing cutting‐edge tools and leveraging deep industry knowledge, we consistently meet accelerated schedules, adhere to rigorous regulatory requirements, and support the development of reliable, robust transportation networks.
6.01(a), 6.01(b), 6.02, 6.03, 6.04(a), 6.04(b), 6.05
8.01, 8.02
9.01, 9.02, 9.03
9.1 , 9.2, 9.3, 9.4.1, 9.4.2, 9.5
10.1, 10.3
Provided Geotechnical Engineering Recommendations and pavement evaluations services on SR 155 Candler Road in DeKalb County. The total length of the project is 3.6 miles.
Provided Geotechnical Engineering Consulting Services and performed a Bridge Foundation Investigation (BFI) Study. The bridge consisted of six (6) spans, three are 140′ and three
Provided pavement evaluations and recommendation services on Interstate I-85, SR 53 & US 129/SR 11 in Jackson County, Georgia. The total length of the study is Eight (8) miles in each direction. The scope of services included providing pavement condition surveys and pavement design evaluations along with Geotechnical Engineering Recommendations along I-85 main line north and south bounds and for the ramps at the interchange of SR 53 and interchange at SR 11.
The project consisted of the design of two (2) new bridges over Euharlee Creek in Bartow County, Georgia, which is known to be prone to sinkhole development. We performed geotechnical investigations and foundation engineering recommendations for the deep foundation system for the project. We performed Geophysical study including Electrical Resistivity Survey at the site which confirmed that several Karst anomalies existed. We provided remediation plan consisting of grout injection. Our foundation recommendations included H-piles. Geophysical testing, minimum pile tip elevation based on compression/tension and pile installation criteria. We provided quality control inspection and testing for the entire duration of the project.
Provided Geotechnical Engineering Recommendations Consisted of asphalt and concrete pavement cores and soils borings for roadway improvements, including retaining walls and adding totem poles and shelter structures at for several bus stops along Fletcher and Nebraska Avenues in Tampa, Florida.
Provided geotechnical investigations and recommendations for the milling and resurfacing of this roadway in Pinellas County. The work was performed for FDOT District 7.