CR 817, Lee Road, and South Sweetwater Road Widening
MC Squared (MC²) is supporting Lowe Engineers on a roadway widening improvement project along CR 817, Lee Road, and South Sweetwater Road in Douglas County,
MC Squared provides comprehensive support for transportation infrastructure projects. With specialized expertise in geotechnical analysis, pavement design, materials testing, and construction management, the firm ensures that structures perform safely and effectively under continuous demand.
We are committed to delivering cost‐effective solutions that stand the test of time, integrating advanced design concepts with proven construction management practices. From local street enhancements to major highways and bridges, the firm emphasizes sustainability and resilience, working closely with public agencies and private stakeholders to mitigate congestion, reduce emissions, and promote public safety.
By employing cutting‐edge tools and leveraging deep industry knowledge, we consistently meet accelerated schedules, adhere to rigorous regulatory requirements, and support the development of reliable, robust transportation networks.
6.01(a), 6.01(b), 6.02, 6.03, 6.04(a), 6.04(b), 6.05
8.01, 8.02
9.01, 9.02, 9.03
9.1 , 9.2, 9.3, 9.4.1, 9.4.2, 9.5
10.1, 10.3
MC Squared (MC²) is supporting Lowe Engineers on a roadway widening improvement project along CR 817, Lee Road, and South Sweetwater Road in Douglas County,
Provided geotechnical engineering services on this project for the Florida Department of Transportation, Turnpike District. The project involves the design of a new Interchange at Jog Road and Florida’s Turnpike in Palm Beach County, Florida. The work was performed for FDOT Turnpike District.
MC Squared is serving Lane Construction and the Florida Department of Transportation (FDOT) as the Construction Support subcontractor for the I-4 and SR 33 Interchange
Provided pavement evaluations and recommendation services on Interstate I-85, SR 53 & US 129/SR 11 in Jackson County, Georgia. The total length of the study is Eight (8) miles in each direction. The scope of services included providing pavement condition surveys and pavement design evaluations along with Geotechnical Engineering Recommendations along I-85 main line north and south bounds and for the ramps at the interchange of SR 53 and interchange at SR 11.
Provided geotechnical services for the project which consisted of the following: Bridge Foundation Investigation, Wall Foundation Investigations, Soil Survey, and full Pavement Evaluation and Design. The project is located in Riverdale, Clayton County Georgia.
Provided geotechnical engineering on this project for the Florida Department of Transportation, District 1. The project involved the design of a new high level bridge, approximately 1500 feet in length. The work was performed for FDOT District 1.