MC Squared provides comprehensive support for transportation infrastructure projects. With specialized expertise in geotechnical analysis, pavement design, materials testing, and construction management, the firm ensures that structures perform safely and effectively under continuous demand.

We are committed to delivering cost‐effective solutions that stand the test of time, integrating advanced design concepts with proven construction management practices. From local street enhancements to major highways and bridges, the firm emphasizes sustainability and resilience, working closely with public agencies and private stakeholders to mitigate congestion, reduce emissions, and promote public safety.

By employing cutting‐edge tools and leveraging deep industry knowledge, we consistently meet accelerated schedules, adhere to rigorous regulatory requirements, and support the development of reliable, robust transportation networks.

GDOT Prequalifications

6.01(a),  6.01(b), 6.02, 6.03, 6.04(a),  6.04(b),  6.05 

8.01,  8.02 

9.01, 9.02, 9.03 

FDOT Prequalifications

9.1 , 9.2,  9.3, 9.4.1, 9.4.2, 9.5 

10.1, 10.3 

scDOT Prequalifications

TRANSPORTATION PROJECTS

TRANSPORTATION
PROJECTS

SR 120 (Abbotts Bridge Road) City of Johns Creek, Fulton County, Georgia

Provided geotechnical services for the existing Pavement Evaluation and Design and Soil Survey along the roadway along SR 120, Abbotts Bridge Road, City of Johns Creek, Fulton County Georgia. The scope included coring of pavement along the project alignment, evaluation of the existing asphalt condition and thickness based on the cores taken, the analyses of existing base and/or subbase materials and performing pavement design for full depth replacement and overlay designs per GDOT requirements.

SR 40 Widening 820, Charlton/Camden, Georgia

Provided Geotechnical Engineering Recommendations for the roadway consisting of Pavement Evaluation, Soil Survey and Wall Foundation Recommendation along SR 40 east of St. Mary’s cutoff/MP 5.0/Charlton to CR 61 in Camden and Charlton Counties, GA. The total length of the roadway is approximately 11.67 miles. The project consists of approximately 10.2 miles of pavement overlay, 11.67 miles of new pavement ranging from 2 to 4 lanes, and five (5) culvert extensions. Approximately 2.2 miles of wetland area exists along the project alignment.

Jog Road Interchange at Florida’s Turnpike, Palm Beach County, Florida

Provided geotechnical engineering services on this project for the Florida Department of Transportation, Turnpike District. The project involves the design of a new Interchange at Jog Road and Florida’s Turnpike in Palm Beach County, Florida. The work was performed for FDOT Turnpike District.