Skip to content

TRANSPORTATION

TRANSPORTATION

Markets

TRANSPORTATION

MC Squared provides comprehensive support for transportation infrastructure projects. With specialized expertise in geotechnical analysis, pavement design, materials testing, and construction management, the firm ensures that structures perform safely and effectively under continuous demand.

We are committed to delivering cost‐effective solutions that stand the test of time, integrating advanced design concepts with proven construction management practices. From local street enhancements to major highways and bridges, the firm emphasizes sustainability and resilience, working closely with public agencies and private stakeholders to mitigate congestion, reduce emissions, and promote public safety.

By employing cutting‐edge tools and leveraging deep industry knowledge, we consistently meet accelerated schedules, adhere to rigorous regulatory requirements, and support the development of reliable, robust transportation networks.

GDOT Prequalifications

6.01(a),  6.01(b), 6.02, 6.03, 6.04(a),  6.04(b),  6.05 

8.01,  8.02 

9.01, 9.02, 9.03 

FDOT Prequalifications

9.1 , 9.2,  9.3, 9.4.1, 9.4.2, 9.5 

10.1, 10.3 

scDOT Prequalifications

TRANSPORTATION PROJECTS

TRANSPORTATION
PROJECTS

Sardis Rd Connector, Gainesville, Georgia

Provided geotechnical engineering services for the Sardis Rd Connector project in Gainesville GA. The project consisted of both a GDOT Soil Survey, and a Level II contamination screening at selected sites throughout the future roadway corridor. Our scope of services including soil survey and Level II Environmental Contamination Screening.

Benjamin Road Bridge Replacement, Hillsborough County, Florida

Provided subsurface investigations, geophysical studies, testing and foundation recommendations and associated reports for the replacement of the Benjamin Road Bridge over Sweetwater Creek in Northwest Hillsborough County. We further monitored pile driving inspections during the construction phase of the project. The work was performed for Hillsborough County.

SR 40 Widening 820, Charlton/Camden, Georgia

Provided Geotechnical Engineering Recommendations for the roadway consisting of Pavement Evaluation, Soil Survey and Wall Foundation Recommendation along SR 40 east of St. Mary’s cutoff/MP 5.0/Charlton to CR 61 in Camden and Charlton Counties, GA. The total length of the roadway is approximately 11.67 miles. The project consists of approximately 10.2 miles of pavement overlay, 11.67 miles of new pavement ranging from 2 to 4 lanes, and five (5) culvert extensions. Approximately 2.2 miles of wetland area exists along the project alignment.

SR 105 at US 44, Habersham County, Georgia

Provided Geotechnical Engineering Recommendations for the Widening of SR105 from the intersection of Cannon Bridge Rd, west of SR 365 to Walnut Street in Cornelia for a total of 2.74 miles. In the project is the reconstruction of the interchange at US441/SR 105 and SR 365 as a diamond interchange. The construction widens US441/ SR 105 to a six- lane divided roadway with a 20′ raised median from Cannon Bridge road to SR 365.

I-85, SR 53 US 129/SR 11, Jackson County, Georgia

Provided pavement evaluations and recommendation services on Interstate I-85, SR 53 & US 129/SR 11 in Jackson County, Georgia. The total length of the study is Eight (8) miles in each direction. The scope of services included providing pavement condition surveys and pavement design evaluations along with Geotechnical Engineering Recommendations along I-85 main line north and south bounds and for the ramps at the interchange of SR 53 and interchange at SR 11.