I-4 at SR 33 Interchange in Polk County, Florida
MC Squared is serving Lane Construction and the Florida Department of Transportation (FDOT) as the Construction Support subcontractor for the I-4 and SR 33 Interchange
MC Squared provides comprehensive support for transportation infrastructure projects. With specialized expertise in geotechnical analysis, pavement design, materials testing, and construction management, the firm ensures that structures perform safely and effectively under continuous demand.
We are committed to delivering cost‐effective solutions that stand the test of time, integrating advanced design concepts with proven construction management practices. From local street enhancements to major highways and bridges, the firm emphasizes sustainability and resilience, working closely with public agencies and private stakeholders to mitigate congestion, reduce emissions, and promote public safety.
By employing cutting‐edge tools and leveraging deep industry knowledge, we consistently meet accelerated schedules, adhere to rigorous regulatory requirements, and support the development of reliable, robust transportation networks.
6.01(a), 6.01(b), 6.02, 6.03, 6.04(a), 6.04(b), 6.05
8.01, 8.02
9.01, 9.02, 9.03
9.1 , 9.2, 9.3, 9.4.1, 9.4.2, 9.5
10.1, 10.3
MC Squared is serving Lane Construction and the Florida Department of Transportation (FDOT) as the Construction Support subcontractor for the I-4 and SR 33 Interchange
Provided evaluation of the existing pavement conditions to support the Concept Development/Validation of various roadway projects along SR 101, to evaluate the need for overlay, full depth or reconstruction.
Provided geotechnical engineering services for the installation of permeable interlocking concrete pavers (PICP) on top of open graded aggregate. The objective of this study is to provide the information for the design of green infrastructure stormwater improvement solution to mitigate local flooding.
Provided Geotechnical Engineering Recommendations and pavement evaluations services on SR 155 Candler Road in DeKalb County. The total length of the project is 3.6 miles.
Provided geotechnical investigations and recommendations for the milling and resurfacing of this roadway in Pinellas County. The project also included new paved shoulders and extended from McMullen Booth Road to Main Street. The work was performed for FDOT District 7.
Provided Geotechnical Engineering Recommendations for the roadway consisting of Pavement Evaluation, Soil Survey and Wall Foundation Recommendation along SR 40 east of St. Mary’s cutoff/MP 5.0/Charlton to CR 61 in Camden and Charlton Counties, GA. The total length of the roadway is approximately 11.67 miles. The project consists of approximately 10.2 miles of pavement overlay, 11.67 miles of new pavement ranging from 2 to 4 lanes, and five (5) culvert extensions. Approximately 2.2 miles of wetland area exists along the project alignment.