Alternate US 19, Harry Street to Meres Boulevard, Pinellas County, Florida
Provided geotechnical investigations and recommendations for the milling and resurfacing of this roadway in Pinellas County. The work was performed for FDOT District 7.
MC Squared offers practical and cost-effective design recommendations, drawing on the extensive experience of our staff in advanced data gathering, engineering analysis, and design. By combining cutting-edge technology with practical engineering knowledge, we provide valuable services to the design team, ensuring the project’s success. Our principals have significant experience working on pavement design projects for interstate, arterial, and local roadways in Florida, Georgia, and South Carolina.
We have successfully completed a variety of projects, ranging from simple to complex, in the following areas:
Provided geotechnical investigations and recommendations for the milling and resurfacing of this roadway in Pinellas County. The work was performed for FDOT District 7.
Provided Geotechnical Engineering and pavement design recommendations as well as construction materials testing and inspection for Taxiway B and C and C-130 Apron. Concrete testing, beam testing, straightedge/smoothness testing & compaction tests.
Provided Engineering Services and construction materials testing and inspection for the construction of an aircraft apron and supporting facilities to provide a minimum of five unobstructed narrow-body deicing positions on the north airfield with the capability of deicing ten aircraft per hour. The project includes approximately 580,000 square feet of new apron pavement, approximately 100,000 square feet of pavement repairs, demolition of existing utilities and construction of new utilities, a 1.5 M gallon underground storage vault for spent glycol run-off, product storage tanks for Type I and Type IV glycol and diesel fuel, heaters for water, pumping facilities, and truck loading and unloading stations.
Provided Geotechnical Engineering Services for the roadway consisting of Pavement Evaluation, Soil Survey and Wall Foundation Recommendation along SR 40 from Conn/Folkston to MP 2.75/E of CR 82, Charlton Counties, GA. The total length of the roadway is approximately 1.9 miles. The project consists of approximately 1.9 miles of pavement overlay, about 1.75 miles of new pavement ranging from 2 to 3 lanes, and one (1) bridge culvert with retaining walls.
Provided geotechnical investigations and recommendations for the addition of left turn lanes at this intersection. The work was performed for FDOT District 7.
Provided Geotechnical Engineering Recommendations and pavement evaluations services on SR 155 Candler Road in DeKalb County. The total length of the project is 3.6 miles.