WB Casey WWTP, Clayton County, Georgia
Provided construction inspection and testing of various components of the Water Treatment Plant at the WB Casey WTP. Services included construction oversight and inspection.
MC Squared provides specialized geotechnical and materials testing services for water and wastewater infrastructure projects. Our expertise supports the development of reservoirs, treatment facilities, pump stations, and distribution systems, ensuring structural integrity and long-term performance under varying environmental conditions.
We prioritize cost-effective, sustainable solutions that enhance water quality, protect public health, and improve system reliability. Our team collaborates with municipalities, utilities, and engineering firms to optimize designs, mitigate risks, and support regulatory compliance throughout the project lifecycle.
Through advanced testing methodologies and a deep understanding of subsurface conditions, we help deliver resilient infrastructure that efficiently manages water resources and withstands future demand.
Provided construction inspection and testing of various components of the Water Treatment Plant at the WB Casey WTP. Services included construction oversight and inspection.
MC Squared is supporting Wade Trim and Fulton County in upgrading the influent pump station at the Utoy Creek Water Reclamation Center. MC Squared provides geotechnical engineering services throughout the design and early construction phases. Our team conducted site investigations to evaluate subsurface conditions, including soil behavior and groundwater levels, which are vital for planning stable, long-lasting foundation systems. We also assist with stakeholder coordination and provide geotechnical insights to help guide demolition planning and phased construction activities.
Provided materials testing of soils, concrete and asphalt for this expansion project, which includes a new sodium hypochlorite storage and feed building, new chemical mixing station, reservoir flow control and metering station, yard piping and civil grading and paving.
Provided Geotechnical Engineering Recommendations and construction materials testing and inspection for the 100 acres natural effluent treatment facility. The project consists of building an impoundment (earthen dam) to treat wastewater.
The tunnel itself is proposed to be approximately 5 miles long, have a 27-foot diameter, and have a storage volume of 88 million gallons. Tunnel
Provided construction materials testing and inspection for the Walnut Creek Water Reclamation Facility LAS Expansion II.