MC Squared provides comprehensive support for transportation infrastructure projects. With specialized expertise in geotechnical analysis, pavement design, materials testing, and construction management, the firm ensures that structures perform safely and effectively under continuous demand.

We are committed to delivering cost‐effective solutions that stand the test of time, integrating advanced design concepts with proven construction management practices. From local street enhancements to major highways and bridges, the firm emphasizes sustainability and resilience, working closely with public agencies and private stakeholders to mitigate congestion, reduce emissions, and promote public safety.

By employing cutting‐edge tools and leveraging deep industry knowledge, we consistently meet accelerated schedules, adhere to rigorous regulatory requirements, and support the development of reliable, robust transportation networks.

GDOT Prequalifications

6.01(a),  6.01(b), 6.02, 6.03, 6.04(a),  6.04(b),  6.05 

8.01,  8.02 

9.01, 9.02, 9.03 

FDOT Prequalifications

9.1 , 9.2,  9.3, 9.4.1, 9.4.2, 9.5 

10.1, 10.3 

scDOT Prequalifications

TRANSPORTATION PROJECTS

TRANSPORTATION
PROJECTS

I-85, SR 53 US 129/SR 11, Jackson County, Georgia

Provided pavement evaluations and recommendation services on Interstate I-85, SR 53 & US 129/SR 11 in Jackson County, Georgia. The total length of the study is Eight (8) miles in each direction. The scope of services included providing pavement condition surveys and pavement design evaluations along with Geotechnical Engineering Recommendations along I-85 main line north and south bounds and for the ramps at the interchange of SR 53 and interchange at SR 11.

US 41 Bypass, Sarasota County, Florida

Provided subsurface investigations, testing and foundation recommendations and associated reports for the reconstruction of US 41 Bypass. The limits of the project were from Center Road to Bird Bay Drive, a distance of approximately 2.3 miles. The work was performed for FDOT District 1.

SR 40 Connector 821, Charlton, Georgia

Provided Geotechnical Engineering Services for the roadway consisting of Pavement Evaluation, Soil Survey and Wall Foundation Recommendation along SR 40 from Conn/Folkston to MP 2.75/E of CR 82, Charlton Counties, GA. The total length of the roadway is approximately 1.9 miles. The project consists of approximately 1.9 miles of pavement overlay, about 1.75 miles of new pavement ranging from 2 to 3 lanes, and one (1) bridge culvert with retaining walls.

US 27 at Cluster Road, Muscogee County, Columbus, Georgia

Provided geotechnical investigations and recommendations for the foundation design and construction of two separate bridges at US 27 and Custer Road, Muscogee County, Columbus, Georgia. Two Bridge Foundation Investigations were performed for two span bridge and three span bridge for future roadway and bridge construction and improvements. The scope included Static Pile Bearing Capacity Analysis for multiple pile types, soil design parameter analysis and reporting, as well as the foundation investigation for multiple MSE walls to accompany bridge construction.