Snapfinger WWTP Dewatering Building Decatur, Georgia
Provided geotechnical exploration, laboratory testing and engineering recommendations for the Snapfinger Wastewater Treatment Plant Dewatering Building.
MC Squared offers practical and cost-effective geotechnical and foundation design recommendations backed by the extensive experience of our staff. Our team employs advanced data gathering techniques alongside practical engineering principles to deliver value-added services that support the design team in making projects successful. Our principals have worked on thousands of engineering projects across Florida, Georgia, South Carolina, and the surrounding region, ensuring that their design recommendations lead to successful construction.
We have successfully completed a variety of projects, ranging from simple to complex, in the following areas:
Provided geotechnical exploration, laboratory testing and engineering recommendations for the Snapfinger Wastewater Treatment Plant Dewatering Building.
Provided evaluation of the existing pavement conditions to support the Concept Development/Validation of various roadway projects along SR 101, to evaluate the need for overlay, full depth or reconstruction.
Provided Geotechnical Engineering Recommendations for the widening/reconstructing SR 20 from an existing two lane rural highway to a divided four-lane rural highway along SR 20 from SR 369 in Cherokee County to SR 371 in Forsyth County. The total length of the road is about 6.5 miles. Provided, Inc. performed pavement study and soil survey.
Provided subsurface investigations, testing and foundation recommendations and associated reports for the reconstruction of US 41 Bypass. The limits of the project were from Center Road to Bird Bay Drive, a distance of approximately 2.3 miles. The work was performed for FDOT District 1.
Provided consulting engineering, construction oversight, management & inspection and construction materials testing and engineering recommendations of soils, concrete and asphalt for the Highland Avenue WTP. Construction costs $70 million.
Provided geotechnical engineering on this project for the Florida Department of Transportation, District 1. The project involved the design of a new high level bridge, approximately 1500 feet in length. The work was performed for FDOT District 1.