Skip to content

GEOTECHNICAL
ENGINEERING

GEOTECHNICAL
ENGINEERING

GEOTECHNICAL EXPERTISE

MC Squared offers practical and cost-effective geotechnical and foundation design recommendations backed by the extensive experience of our staff. Our team employs advanced data gathering techniques alongside practical engineering principles to deliver value-added services that support the design team in making projects successful. Our principals have worked on thousands of engineering projects across Florida, Georgia, South Carolina, and the surrounding region, ensuring that their design recommendations lead to successful construction.

SERVICES

  • Pre-development and siting.
  • Feasibility studies.
  • Development of scope of services.
  • Field exploration and data gathering.
  • Laboratory analysis and data validation.
  • Alternate foundation analysis and economic study.
  • Foundation construction recommendation.
  • Value-engineering and post design services.
  • Lake Restorations and Enhancements.
  • Seismic analysis.
  • Geologic hazards analysis and design.
  • Geophysical explorations and analysis.
  • Earth slope stability and retaining structures.
  • Earth and Rock tunnel analysis and design.
  • Earth instrumentations.
  • Pile driving analysis and failure analysis.
  • Drilled shafts design and inspection.
  • Effluent disposal and Hydrological modeling.
  • Ground water monitoring plan and modeling.
  • Rock mechanics.
  • Soil dynamics.
  • Sediment Studies.

GEOTECHNICAL PROJECTS

GEOTECHNICAL
PROJECTS

We have successfully completed a variety of projects, ranging from simple to complex, in the following areas:

  • Commercial and vertical development
  • Roadway and bridges
  • Watershed studies
  • Water & wastewater plants and pipelines
  • Solid Waste & Landfill projects
  • Power generation and utility corridors
  • Dams and impoundment analysis
  • Waterways and Port Dredging
  • Tunnels

SR 40 Connector 821, Charlton, Georgia

Provided Geotechnical Engineering Services for the roadway consisting of Pavement Evaluation, Soil Survey and Wall Foundation Recommendation along SR 40 from Conn/Folkston to MP 2.75/E of CR 82, Charlton Counties, GA. The total length of the roadway is approximately 1.9 miles. The project consists of approximately 1.9 miles of pavement overlay, about 1.75 miles of new pavement ranging from 2 to 3 lanes, and one (1) bridge culvert with retaining walls.

Jameson Road Bridge Replacement, Hillsborough County, Florida

Provided subsurface investigations, testing and foundation recommendations and associated reports for the replacement of the Jamson Road Bridge over the Alafia River in Southeastern Hillsborough County. The work was performed for Hillsborough County, Florida.

US 27 at Cluster Road, Muscogee County, Columbus, Georgia

Provided geotechnical investigations and recommendations for the foundation design and construction of two separate bridges at US 27 and Custer Road, Muscogee County, Columbus, Georgia. Two Bridge Foundation Investigations were performed for two span bridge and three span bridge for future roadway and bridge construction and improvements. The scope included Static Pile Bearing Capacity Analysis for multiple pile types, soil design parameter analysis and reporting, as well as the foundation investigation for multiple MSE walls to accompany bridge construction.

SR 120 (Abbotts Bridge Road) City of Johns Creek, Fulton County, Georgia

Provided geotechnical services for the existing Pavement Evaluation and Design and Soil Survey along the roadway along SR 120, Abbotts Bridge Road, City of Johns Creek, Fulton County Georgia. The scope included coring of pavement along the project alignment, evaluation of the existing asphalt condition and thickness based on the cores taken, the analyses of existing base and/or subbase materials and performing pavement design for full depth replacement and overlay designs per GDOT requirements.

Utoy Creek WRC Influent Pump Station, Fulton County GA

MC Squared is supporting Wade Trim and Fulton County in upgrading the influent pump station at the Utoy Creek Water Reclamation Center. MC Squared provides geotechnical engineering services throughout the design and early construction phases. Our team conducted site investigations to evaluate subsurface conditions, including soil behavior and groundwater levels, which are vital for planning stable, long-lasting foundation systems. We also assist with stakeholder coordination and provide geotechnical insights to help guide demolition planning and phased construction activities.