MC Squared provides comprehensive support for transportation infrastructure projects. With specialized expertise in geotechnical analysis, pavement design, materials testing, and construction management, the firm ensures that structures perform safely and effectively under continuous demand.

We are committed to delivering cost‐effective solutions that stand the test of time, integrating advanced design concepts with proven construction management practices. From local street enhancements to major highways and bridges, the firm emphasizes sustainability and resilience, working closely with public agencies and private stakeholders to mitigate congestion, reduce emissions, and promote public safety.

By employing cutting‐edge tools and leveraging deep industry knowledge, we consistently meet accelerated schedules, adhere to rigorous regulatory requirements, and support the development of reliable, robust transportation networks.

GDOT Prequalifications

6.01(a),  6.01(b), 6.02, 6.03, 6.04(a),  6.04(b),  6.05 

8.01,  8.02 

9.01, 9.02, 9.03 

FDOT Prequalifications

9.1 , 9.2,  9.3, 9.4.1, 9.4.2, 9.5 

10.1, 10.3 

scDOT Prequalifications

TRANSPORTATION PROJECTS

TRANSPORTATION
PROJECTS

Benjamin Road Bridge Replacement, Hillsborough County, Florida

Provided subsurface investigations, geophysical studies, testing and foundation recommendations and associated reports for the replacement of the Benjamin Road Bridge over Sweetwater Creek in Northwest Hillsborough County. We further monitored pile driving inspections during the construction phase of the project. The work was performed for Hillsborough County.

SR 40 Widening 820, Charlton/Camden, Georgia

Provided Geotechnical Engineering Recommendations for the roadway consisting of Pavement Evaluation, Soil Survey and Wall Foundation Recommendation along SR 40 east of St. Mary’s cutoff/MP 5.0/Charlton to CR 61 in Camden and Charlton Counties, GA. The total length of the roadway is approximately 11.67 miles. The project consists of approximately 10.2 miles of pavement overlay, 11.67 miles of new pavement ranging from 2 to 4 lanes, and five (5) culvert extensions. Approximately 2.2 miles of wetland area exists along the project alignment.

SR 40 Connector 821, Charlton, Georgia

Provided Geotechnical Engineering Services for the roadway consisting of Pavement Evaluation, Soil Survey and Wall Foundation Recommendation along SR 40 from Conn/Folkston to MP 2.75/E of CR 82, Charlton Counties, GA. The total length of the roadway is approximately 1.9 miles. The project consists of approximately 1.9 miles of pavement overlay, about 1.75 miles of new pavement ranging from 2 to 3 lanes, and one (1) bridge culvert with retaining walls.

US 41 @ Shell Point Road, Hillsborough County, Florida

Provided subsurface investigations, recommendations and associated reports for the widening of US 41 @ Shell Point Road, 17th and 19th Avenues and along 19th Avenue in Hillsborough County. The work was performed for Hillsborough County, Florida.