Tampa International Airport Phase 3 Warehouse
Provided geotechnical investigations and recommendations for a new 35,000 SF warehouse and associated support facilities including an outdoor storage area, parking areas and a stormwater retention pond.
MC Squared offers practical and cost-effective geotechnical and foundation design recommendations backed by the extensive experience of our staff. Our team employs advanced data gathering techniques alongside practical engineering principles to deliver value-added services that support the design team in making projects successful. Our principals have worked on thousands of engineering projects across Florida, Georgia, South Carolina, and the surrounding region, ensuring that their design recommendations lead to successful construction.
We have successfully completed a variety of projects, ranging from simple to complex, in the following areas:
Provided geotechnical investigations and recommendations for a new 35,000 SF warehouse and associated support facilities including an outdoor storage area, parking areas and a stormwater retention pond.
Provided geotechnical services for the existing Pavement Evaluation and Design and Soil Survey along the roadway along SR 120, Abbotts Bridge Road, City of Johns Creek, Fulton County Georgia. The scope included coring of pavement along the project alignment, evaluation of the existing asphalt condition and thickness based on the cores taken, the analyses of existing base and/or subbase materials and performing pavement design for full depth replacement and overlay designs per GDOT requirements.
Provided pavement evaluations and recommendation services on Interstate I-85, SR 53 & US 129/SR 11 in Jackson County, Georgia. The total length of the study is Eight (8) miles in each direction. The scope of services included providing pavement condition surveys and pavement design evaluations along with Geotechnical Engineering Recommendations along I-85 main line north and south bounds and for the ramps at the interchange of SR 53 and interchange at SR 11.
Developed by C-43 Water Management Builders for the South Florida Water Management District (SFWMD) and U.S. Army Corps of Engineers (USACE), the C-43 West Basin Storage Reservoir is a 170,000-acre-foot infrastructure project designed to store excess freshwater from the Caloosahatchee River, stabilize salinity levels, and prevent algal blooms. MC Squared provided critical laboratory management, construction materials testing, and quality control, ensuring compliance with USACE standards. Our contributions—including testing 22 million cubic yards of embankment, 110,000 tons of soil-cement armoring, and 19 miles of soil-bentonite cutoff wall—have helped ensure the reservoir’s durability, reliability, and long-term impact on Florida’s water resources and communities.
Provided subsurface investigations, testing and foundation recommendations and associated reports for the modification of two interchanges (I-75 and Fruitville RD and I-75 and University Parkway). The project included ramp modifications, drainage, overhead lighting and signalization. The work was performed for FDOT District 1.
The project consisted of the design of two (2) new bridges over Euharlee Creek in Bartow County, Georgia, which is known to be prone to sinkhole development. We performed geotechnical investigations and foundation engineering recommendations for the deep foundation system for the project. We performed Geophysical study including Electrical Resistivity Survey at the site which confirmed that several Karst anomalies existed. We provided remediation plan consisting of grout injection. Our foundation recommendations included H-piles. Geophysical testing, minimum pile tip elevation based on compression/tension and pile installation criteria. We provided quality control inspection and testing for the entire duration of the project.