Big Cypress Airport, Big Cypress, Florida
Provided geotechnical evaluations and recommendations and materials testing and inspection for the rehabilitation of approximately 8000 LF of runway, including the installation of underdrains.
Our Construction Engineering & Inspection (CE&I), Materials Testing (CMT), and Instrumentation (CI) services support infrastructure projects from start to finish. CE&I and CMT ensure soils, concrete, and asphalt meet regulatory and performance standards through rigorous inspections, quality control, and expert oversight. By identifying issues early, ensuring compliance, and optimizing workflows, we help keep projects on track while minimizing risks and delays.
Our Instrumentation specialists provide real-time data and long-term monitoring to assess structural integrity, manage risks, and verify compliance. With industry-leading expertise, accredited labs, and field specialists, we deliver insights that drive confident decision-making.
Provided geotechnical evaluations and recommendations and materials testing and inspection for the rehabilitation of approximately 8000 LF of runway, including the installation of underdrains.
Developed by C-43 Water Management Builders for the South Florida Water Management District (SFWMD) and U.S. Army Corps of Engineers (USACE), the C-43 West Basin Storage Reservoir is a 170,000-acre-foot infrastructure project designed to store excess freshwater from the Caloosahatchee River, stabilize salinity levels, and prevent algal blooms. MC Squared provided critical laboratory management, construction materials testing, and quality control, ensuring compliance with USACE standards. Our contributions—including testing 22 million cubic yards of embankment, 110,000 tons of soil-cement armoring, and 19 miles of soil-bentonite cutoff wall—have helped ensure the reservoir’s durability, reliability, and long-term impact on Florida’s water resources and communities.
Provided Geotechnical Engineering Recommendations Consisted of asphalt and concrete pavement cores and soils borings for roadway improvements, including retaining walls and adding totem poles and shelter structures at for several bus stops along Fletcher and Nebraska Avenues in Tampa, Florida.
Provided subsurface investigations and associated recommendations for the expansion of this facility from 9 to 12 MGD. Components of the project included new headworks, clarifier, new pump station and reject storage tanks. Provided materials testing of soils, concrete and asphalt during construction phase. Construction costs $30 million.
Provided Geotechnical Engineering Recommendations and construction materials testing and inspection for the 100 acres natural effluent treatment facility. The project consists of building an impoundment (earthen dam) to treat wastewater.
Provided engineering recommendations and construction oversight, management & inspection and construction materials testing of soils, concrete and asphalt for the JB Messerly WTP. Construction costs $80 million.