Provided subsurface investigations and associated recommendations for the expansion of this facility from 9 to 12 MGD. Components of the project included new headworks, clarifier, new pump station and reject storage tanks. Provided materials testing of soils, concrete and asphalt during construction phase. Construction costs $30 million.
Continue readingCosme Water Treatment Plant, Pinellas County, Florida
Provided subsurface investigations and associated recommendations for 2 new 800,000 gallon tanks, 1 new 250,000 gallon tank, an elevated walkway and miscellaneous site piping for the existing water treatment facility.
Continue readingSoutheast County Water Reclamation Facility, Hillsborough County, Florida
Provided subsurface investigations and associated design recommendations for the expansion of the facility from 4.5 to 12 MGD. Components of the project included new headworks, bioreactors, clarifiers, filters, reject storage tanks, electrical buildings and pump stations. Provided materials testing of soils, concrete and asphalt during construction phase.
Continue readingValrico Advanced Water Treatment Plant, Hillsborough County, Florida
Provided subsurface investigations and associated foundation recommendations for the expansion of the facility from 6 to 12 MGD. Components of the project included new reclaimed water storage tanks, UV electrical building, new deep bed filters, three new clarifiers, 2 new oxidation ditches, new pump station, two (2) new flow meter assemblies and 3000 LF of new 20 inch pipeline including Horizontal Directional Drilling under an existing creek. Monitored installation of over 3400 pre-stressed concrete piles.
Continue readingPump Station 018, Pinellas County, Florida
Provided geotechnical engineering services to support the design of a new Pump Station and approximately 1000 LF of force main with 3 feet of cover in Pinellas County, Florida.
Continue readingPump Station 079, Pinellas County, Florida
Provided geotechnical engineering services for the proposed improvements associated with project identified as Pinellas County PS 079 Replacement.
Continue readingPump Station 190, Pinellas County, Florida
Provided geotechnical engineering services for the proposed improvements of Pump Station 190 adjacent to Miami Avenue in Indian Rocks Beach, Pinellas County, Florida.
Continue readingRowan Road Pump Station, Pasco County, Florida
Provided geotechnical engineering services associated with the evaluation of existing storm water pump station facility on the east side of Rowan Road in Pasco County, Florida.
Continue readingWB Casey WWTP, Clayton County, Georgia
Provided construction inspection and testing of various components of the Water Treatment Plant at the WB Casey WTP. Services included construction oversight and inspection.
Continue readingPoint Peter Wastewater Treatment Plant Expansion 1.8 to 4.0 MGD & Phase II 4 MG Expansion, St. Marys, Georgia
Provided geotechnical and foundation recommendations for the project vicinity, conduct soil drilling & make recommendations for the foundation design. Also, provided construction oversight, value engineering and inspection. Provided construction materials testing and inspection during Vibro-Replacement for the Biological Treatment and Effluent Pump Station Structures.
Continue reading