Valrico Advanced Water Treatment Plant, Hillsborough County, Florida

Provided subsurface investigations and associated foundation recommendations for the expansion of the facility from 6 to 12 MGD. Components of the project included new reclaimed water storage tanks, UV electrical building, new deep bed filters, three new clarifiers, 2 new oxidation ditches, new pump station, two (2) new flow meter assemblies and 3000 LF of new 20 inch pipeline including Horizontal Directional Drilling under an existing creek. Monitored installation of over 3400 pre-stressed concrete piles.

Continue reading

Point Peter Wastewater Treatment Plant Expansion 1.8 to 4.0 MGD & Phase II 4 MG Expansion, St. Marys, Georgia

Provided geotechnical and foundation recommendations for the project vicinity, conduct soil drilling & make recommendations for the foundation design. Also, provided construction oversight, value engineering and inspection. Provided construction materials testing and inspection during Vibro-Replacement for the Biological Treatment and Effluent Pump Station Structures.

Continue reading