Provided subsurface investigations and associated recommendations for a proposed 48-inch waterline from the David L. Tippin Treatment Plant to South Tampa, a distance of approximately 65,000 LF. The project included horizontal directional drilling and tunneling under the Hillsborough River as well as numerous deep tunnel crossings under major roadways along the project alignment.