Skip to content

TRANSPORTATION

TRANSPORTATION

Markets

TRANSPORTATION

MC Squared provides comprehensive support for transportation infrastructure projects. With specialized expertise in geotechnical analysis, pavement design, materials testing, and construction management, the firm ensures that structures perform safely and effectively under continuous demand.

We are committed to delivering cost‐effective solutions that stand the test of time, integrating advanced design concepts with proven construction management practices. From local street enhancements to major highways and bridges, the firm emphasizes sustainability and resilience, working closely with public agencies and private stakeholders to mitigate congestion, reduce emissions, and promote public safety.

By employing cutting‐edge tools and leveraging deep industry knowledge, we consistently meet accelerated schedules, adhere to rigorous regulatory requirements, and support the development of reliable, robust transportation networks.

GDOT Prequalifications

6.01(a),  6.01(b), 6.02, 6.03, 6.04(a),  6.04(b),  6.05 

8.01,  8.02 

9.01, 9.02, 9.03 

FDOT Prequalifications

9.1 , 9.2,  9.3, 9.4.1, 9.4.2, 9.5 

10.1, 10.3 

scDOT Prequalifications

TRANSPORTATION PROJECTS

TRANSPORTATION
PROJECTS

Jog Road Interchange at Florida’s Turnpike, Palm Beach County, Florida

Provided geotechnical engineering services on this project for the Florida Department of Transportation, Turnpike District. The project involves the design of a new Interchange at Jog Road and Florida’s Turnpike in Palm Beach County, Florida. The work was performed for FDOT Turnpike District.

I-85, SR 53 US 129/SR 11, Jackson County, Georgia

Provided pavement evaluations and recommendation services on Interstate I-85, SR 53 & US 129/SR 11 in Jackson County, Georgia. The total length of the study is Eight (8) miles in each direction. The scope of services included providing pavement condition surveys and pavement design evaluations along with Geotechnical Engineering Recommendations along I-85 main line north and south bounds and for the ramps at the interchange of SR 53 and interchange at SR 11.

US 41 Bypass, Sarasota County, Florida

Provided subsurface investigations, testing and foundation recommendations and associated reports for the reconstruction of US 41 Bypass. The limits of the project were from Center Road to Bird Bay Drive, a distance of approximately 2.3 miles. The work was performed for FDOT District 1.

Valley Hill Rd SW, Clayton County, Georgia

Provided geotechnical services for the project which consisted of the following: Bridge Foundation Investigation, Wall Foundation Investigations, Soil Survey, and full Pavement Evaluation and Design. The project is located in Riverdale, Clayton County Georgia.

Benjamin Road Bridge Replacement, Hillsborough County, Florida

Provided subsurface investigations, geophysical studies, testing and foundation recommendations and associated reports for the replacement of the Benjamin Road Bridge over Sweetwater Creek in Northwest Hillsborough County. We further monitored pile driving inspections during the construction phase of the project. The work was performed for Hillsborough County.