Dale Mabry Stormwater Tunnel, City of Tampa, Florida
Performed a limited Phase I along the project corridor to evaluate potential contamination that could affect the development of the project which included 7000 LF of stormwater tunnel thru a residential neighborhood. Also provided a baseline geotechnical report and laboratory testing to support the future design. The project was intended to alleviate flooding in the South Tampa area of Hillsborough County.